300 S. Wacker – 2015-2016

Address:

Description: 564,000 sq. ft, office building, 36 Floors Re-design and Installation of low power neutral host DAS that covers the venue from the basement to the roof. Dealing with extremely tight ceilings and riser spaces the AECCO Team produced a world class install on time and with excellent performance.

 

300 S. Wacker Dr., Chicago IL 60606

General Contractor:

ExteNet Systems, Inc.

Owner:

Golub And Company

Contact Info

Useful Links

Providing safe and high-quality installations for  20 years!

Follow Us:

 

 

 

620 Pratt Ave N.

Schaumburg, IL 60193

847-301-1790

847-301-1819 FAX

info@aecco.net

© 2018 AMERICAN ELECTRIC CONSTRUCTION COMPANY, LLC

  •  

    • HOME

    • ABOUT

    • SERVICES

    • PROJECTS

    • CONTACT